05-10-2015, 07:02 AM
I want to input cash flow be distributed over the construction time.
For example: The construction time for nuclear power plants is assumed to be six years with the following cash flows.
Year 1: 5%; Year 2: 15%; Year 3: 25%; Year 4: 30%; Year 5: 20%; Year 6: 5%
How can I do this?