Search Results
|
Post |
Author |
Forum |
Replies |
Views |
Posted
[asc]
|
|
|
Thread: Electrolyser Modelling
Post: RE: Electrolyser Modelling
MohammedAbiAfthab Wrote: (08-07-2019, 06:38 PM)
--
Antti-L Wrote: (08-07-2019, 06:09 PM)
--
As you are modelling this kind of hydrogen production and distribution system, and not me, I think you sho... |
|
MohammedAbiAfthab |
TIMES
|
64 |
97,294 |
29-08-2019, 05:17 PM |
|
|
Thread: Curtailment
Post: Curtailment
Dear Antti,
I was finding the curtailed electricity in my model. What I was doing is substracting the total consumed electricity by all electricity consuming processes from the total produced elect... |
|
MohammedAbiAfthab |
TIMES
|
0 |
2,726 |
13-07-2019, 02:34 PM |
|
|
Thread: Storage representation
Post: RE: Storage representation
Antti-L Wrote: (12-07-2019, 09:30 PM)
--
I think you already know how you can have both daynight and seasonal operation: By defining the storage to be of type STS, no? At least I have seen you using... |
|
MohammedAbiAfthab |
TIMES
|
25 |
39,650 |
12-07-2019, 09:35 PM |
|
|
Thread: Storage representation
Post: RE: Storage representation
Antti-L Wrote: (09-07-2019, 07:51 PM)
--
If the process timeslice level (PRC_TSL) is SEASON, NCAP_AF=0.5 would mean limiting the storage level to at most 50% of the nominal maximum annual output acco... |
|
MohammedAbiAfthab |
TIMES
|
25 |
39,650 |
12-07-2019, 08:03 PM |
|
|
Thread: EQ_COMBAL.M (Commodity Balance- Marginal)
Post: RE: EQ_COMBAL.M (Commodity Balance- Marginal)
Antti-L Wrote: (11-07-2019, 10:43 PM)
--
I am not sure what you mean by little detail. EQ_CombalM is the reported undiscounted/disaggregated value of EQ(l)_Combal.M provided by the solver, and all t... |
|
MohammedAbiAfthab |
TIMES
|
5 |
11,577 |
12-07-2019, 07:56 PM |
|
|
Thread: EQ_COMBAL.M (Commodity Balance- Marginal)
Post: RE: EQ_COMBAL.M (Commodity Balance- Marginal)
Antti-L Wrote: (27-12-2017, 05:03 PM)
--
The original EQ_COMBAL.M values provided by the solver are discounted period-wise values.
The EQ_COMBAL.M values reported by TIMES are undiscounted yearly va... |
|
MohammedAbiAfthab |
TIMES
|
5 |
11,577 |
11-07-2019, 03:20 AM |
|
|
Thread: Storage representation
Post: RE: Storage representation
Antti-L Wrote: (09-07-2019, 10:57 PM)
--
No, sorry, I don't understand your calculation.
As I already said in my previous post, the storage level is limited to at most 0.178055×0.57=0.10149 PJ, b... |
|
MohammedAbiAfthab |
TIMES
|
25 |
39,650 |
10-07-2019, 03:48 AM |
|
|
Thread: Storage representation
Post: RE: Storage representation
Antti-L Wrote: (09-07-2019, 09:32 PM)
--
Ok, it looks like, for example, season S09 has 30.345 days. As the capacity is 64.99 PJ, the maximum nominal daily output is 0.178055 PJ. With NCAP_AF=0.57,... |
|
MohammedAbiAfthab |
TIMES
|
25 |
39,650 |
09-07-2019, 10:45 PM |
|
|
Thread: Storage representation
Post: RE: Storage representation
Antti-L Wrote: (09-07-2019, 09:10 PM)
--
Ok, you say the capacity is 64.99 PJ, fine. But I have serious doubts about the length of the seasons. If one season would represent only 30.3 hours (using t... |
|
MohammedAbiAfthab |
TIMES
|
25 |
39,650 |
09-07-2019, 09:14 PM |
|
|
Thread: Storage representation
Post: RE: Storage representation
Attached is the excel file showing flow out, flow in, activity, capacity and YRFR. |
|
MohammedAbiAfthab |
TIMES
|
25 |
39,650 |
09-07-2019, 09:05 PM |
|
|
Thread: Storage representation
Post: RE: Storage representation
Antti-L Wrote: (09-07-2019, 08:40 PM)
--
VAR_ACT for a DAYNITE storage does not directly give the storage level, but the storage level multiplied by the number of days in the season. Remember that t... |
|
MohammedAbiAfthab |
TIMES
|
25 |
39,650 |
09-07-2019, 08:52 PM |
|
|
Thread: Storage representation
Post: RE: Storage representation
Antti-L Wrote: (09-07-2019, 07:51 PM)
--
If the process timeslice level (PRC_TSL) is SEASON, NCAP_AF=0.5 would mean limiting the storage level to at most 50% of the maximum annual output according to... |
|
MohammedAbiAfthab |
TIMES
|
25 |
39,650 |
09-07-2019, 08:26 PM |
|
|
Thread: Storage representation
Post: RE: Storage representation
Antti-L Wrote: (09-07-2019, 07:51 PM)
--
If the process timeslice level (PRC_TSL) is SEASON, NCAP_AF=0.5 would mean limiting the storage level to at most 50% of the maximum annual output according to... |
|
MohammedAbiAfthab |
TIMES
|
25 |
39,650 |
09-07-2019, 07:55 PM |
|
|
Thread: Storage representation
Post: RE: Storage representation
Antti-L Wrote: (04-07-2019, 10:41 PM)
--
Yes, in addition to AFC, define NCAP_AF for defining the maximum storage level in proportion to max. nominal output in one day. Whether it is an additional c... |
|
MohammedAbiAfthab |
TIMES
|
25 |
39,650 |
09-07-2019, 07:38 PM |
|
|
Thread: how to relax conversion criteria?
Post: RE: how to relax conversion criteria?
AKanudia Wrote: (08-07-2019, 01:49 PM)
--
https://www.slideshare.net/IEA-ETSAP/improving-the-solution-time-of-times-by-playing-with-cplexbarrier (https://www.slideshare.net/IEA-ETSAP/improving-the-so... |
|
MohammedAbiAfthab |
TIMES
|
2 |
5,404 |
08-07-2019, 08:17 PM |