IEA-ETSAP Forum

Full Version: Modeling Supplemental Heating Devices
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Hello,  I would like to model a dual heating systems such that there is a primary heating system (e.g, electric heat pump) and a supplemental system (e.g, natural gas boiler). The supplemental system would only be available at during the peak time-slice. Going through the documentation, it seems that time dependent availability (AF(Z)(Y)) and PEAK(CON) can only be used for conversion plants.  We are transitioning the model to VEDA soon, so if a solution existing in VEDA that would also be useful. Thank you!