Dear Dr. Antti,
The issue is my objective value changes drastically after the changes moreover significant changes observed in installed capacity mix after the change.
Can you please suggest whether I am doing the right way and what could be the possible reasons for such drastic change?
Regards
Vinay Saini
Greetings of the day.
I have made a model that have the following data Periods (2012, 2017, 2022, 2027, 2032, 2037, 2042, 2047, 2052) and Result Periods (2012, 2017, 2022, 2027, 2032, 2037, 2042, 2047, 2052). My base year for the model is 2012.
The Beginning and End year of the data periods are provided as shown in image below (Refer Image : Model without Change)
Now I wanted to generate the result for 2015, 2020, 2025, 2030, 2035, 2040, 2045, 2050 without changing the data year, so I undertook the following:
· Added result time periods 2015, 2020, 2025, 2030, 2035, 2040, 2045, 2050
· Now I ran the model (without changing any input data) by specifying the model milestone years as shown below in image (Refer Image : Model with Change)
And so on for 2050. Please note here, I have made a change in the base year 2012 by making its beginning and end years as same.
Objective value without change 46,339,808.0000
Objective value with change 10,700,604.0000
The issue is my objective value changes drastically after the changes moreover significant changes observed in installed capacity mix after the change.
Can you please suggest whether I am doing the right way and what could be the possible reasons for such drastic change?
Regards
Vinay Saini