Dear Antti,
Thank you very much for your help in figuring out the problem. I have declared seasonal COM_FR for HYDS-1(INFLOW), which is directed to seasonal storage process and the output of the storage is HYDS-1(INFLOW). Then i have created a separate hydro turbine process (normal process without storage) consuming HYDS-1 and output (ELC) at DAY-NITE level with a certain annual availability factor. When this does not work, i added additional normal process which consume HYDS-1(out put of storage) and produce HYDS-2(INFLOW) which ultimately directed to turbine - this does not seem logical but i gave it a try though it does not work either.
To answer the questions: 1)Yes i have defined 97% efficency, AF(annual) 41% 2) PG is ELC 3) both have seasonal timeslice levels.
My question is why the storage output is not linked with turbine input?
Regards,
Thank you very much for your help in figuring out the problem. I have declared seasonal COM_FR for HYDS-1(INFLOW), which is directed to seasonal storage process and the output of the storage is HYDS-1(INFLOW). Then i have created a separate hydro turbine process (normal process without storage) consuming HYDS-1 and output (ELC) at DAY-NITE level with a certain annual availability factor. When this does not work, i added additional normal process which consume HYDS-1(out put of storage) and produce HYDS-2(INFLOW) which ultimately directed to turbine - this does not seem logical but i gave it a try though it does not work either.
To answer the questions: 1)Yes i have defined 97% efficency, AF(annual) 41% 2) PG is ELC 3) both have seasonal timeslice levels.
My question is why the storage output is not linked with turbine input?
Regards,