Error with transmission process
#1
Query added as pdf file as I am unable to add table and images here.


Attached Files
.pdf   Modelling Issue with tranmission process .pdf (Size: 251.14 KB / Downloads: 13)
Reply
#2
(20-08-2019, 03:56 PM)vsaini Wrote: Now the issue is when I am running the model and analysing the result, I observed that my EEG input (Var_FLO_IN) for BH_TNW process is not equal to the sum of all EEG produced by power plants.
Now for testing, I removed the NCAP_Cost from my process BH_TNW and I get the below number i.e. EEG Generation = EEG (var_flo_in) for BH_TNW except for year 2015. I am unable to understand why the factor NCAP_cost for process BH_TNW is creating this issue.
The obvious explanation is that you have overproduction: Your power plants produce more than what goes to inland demand and exports. Why does it not then get exported when you have the NCAP_COST? Obviously the existing capacity of BH_TNW is not sufficient for exporting all of it, and the export price is not sufficiently high to merit investing into BH_TNW all the additional capacity that would be needed for exporting the full surplus, when the investment costs are those as you had specified by NCAP_cost.

If desired, you could force all produced electricity to be fed into BH_TNW by setting COM_BNDNET(r,'0',ELEG,ANNUAL,UP)=2. I have no possibility to know why your model maintains such high production levels and is then even wasting it, but I guess it is probably zero-cost renewable generation in some timeslices with abundant hydro/solar/wind.
Reply
#3
(20-08-2019, 06:06 PM)Antti-L Wrote:
(20-08-2019, 03:56 PM)vsaini Wrote: Now the issue is when I am running the model and analysing the result, I observed that my EEG input (Var_FLO_IN) for BH_TNW process is not equal to the sum of all EEG produced by power plants.
Now for testing, I removed the NCAP_Cost from my process BH_TNW and I get the below number i.e. EEG Generation = EEG (var_flo_in) for BH_TNW except for year 2015. I am unable to understand why the factor NCAP_cost for process BH_TNW is creating this issue.
The obvious explanation is that you have overproduction: Your power plants produce more than what goes to inland demand and exports. Why does it not then get exported when you have the NCAP_COST? Obviously the existing capacity of BH_TNW is not sufficient for exporting all of it, and the export price is not sufficiently high to merit investing into BH_TNW all the additional capacity that would be needed for exporting the full surplus, when the investment costs are those as you had specified by NCAP_cost.

If desired, you could force all produced electricity to be fed into BH_TNW by setting COM_BNDNET(r,'0',ELEG,ANNUAL,UP)=2. I have no possibility to know why your model maintains such high production levels and is then even wasting it, but I guess it is probably zero-cost renewable generation in some timeslices with abundant hydro/solar/wind.
Dear Dr Antti, 

Thank you for your reply. Please see the PDF for model results at different export prices. 

Warm regards
Vinay Saini


Attached Files
.pdf   Modelling Issue with Transmission Process.pdf (Size: 258.87 KB / Downloads: 8)