Error with transmission process - Printable Version +- IEA-ETSAP Forum (https://iea-etsap.org/forum) +-- Forum: Model Generators (https://iea-etsap.org/forum/forumdisplay.php?fid=2) +--- Forum: TIMES (https://iea-etsap.org/forum/forumdisplay.php?fid=8) +--- Thread: Error with transmission process (/showthread.php?tid=167) |
Error with transmission process - vsaini - 20-08-2019 Query added as pdf file as I am unable to add table and images here. RE: Error with transmission process - Antti-L - 20-08-2019 (20-08-2019, 03:56 PM)vsaini Wrote: Now the issue is when I am running the model and analysing the result, I observed that my EEG input (Var_FLO_IN) for BH_TNW process is not equal to the sum of all EEG produced by power plants. Now for testing, I removed the NCAP_Cost from my process BH_TNW and I get the below number i.e. EEG Generation = EEG (var_flo_in) for BH_TNW except for year 2015. I am unable to understand why the factor NCAP_cost for process BH_TNW is creating this issue.The obvious explanation is that you have overproduction: Your power plants produce more than what goes to inland demand and exports. Why does it not then get exported when you have the NCAP_COST? Obviously the existing capacity of BH_TNW is not sufficient for exporting all of it, and the export price is not sufficiently high to merit investing into BH_TNW all the additional capacity that would be needed for exporting the full surplus, when the investment costs are those as you had specified by NCAP_cost. If desired, you could force all produced electricity to be fed into BH_TNW by setting COM_BNDNET(r,'0',ELEG,ANNUAL,UP)=2. I have no possibility to know why your model maintains such high production levels and is then even wasting it, but I guess it is probably zero-cost renewable generation in some timeslices with abundant hydro/solar/wind. RE: Error with transmission process - vsaini - 22-08-2019 (20-08-2019, 06:06 PM)Antti-L Wrote:Dear Dr Antti, Thank you for your reply. Please see the PDF for model results at different export prices. Warm regards Vinay Saini(20-08-2019, 03:56 PM)vsaini Wrote: Now the issue is when I am running the model and analysing the result, I observed that my EEG input (Var_FLO_IN) for BH_TNW process is not equal to the sum of all EEG produced by power plants. Now for testing, I removed the NCAP_Cost from my process BH_TNW and I get the below number i.e. EEG Generation = EEG (var_flo_in) for BH_TNW except for year 2015. I am unable to understand why the factor NCAP_cost for process BH_TNW is creating this issue.The obvious explanation is that you have overproduction: Your power plants produce more than what goes to inland demand and exports. Why does it not then get exported when you have the NCAP_COST? Obviously the existing capacity of BH_TNW is not sufficient for exporting all of it, and the export price is not sufficiently high to merit investing into BH_TNW all the additional capacity that would be needed for exporting the full surplus, when the investment costs are those as you had specified by NCAP_cost. If desired, you could force all produced electricity to be fed into BH_TNW by setting COM_BNDNET(r,'0',ELEG,ANNUAL,UP)=2. I have no possibility to know why your model maintains such high production levels and is then even wasting it, but I guess it is probably zero-cost renewable generation in some timeslices with abundant hydro/solar/wind. |